您好,歡迎訪問(wèn)禹城泰瑞彩鋼復(fù)合板加工廠!

服務(wù)熱線

18765446878

熱門(mén)關(guān)鍵詞:禹城彩鋼廠,禹城彩鋼復(fù)合板,禹城鋼結(jié)構(gòu)板房 彩鋼板房
當(dāng)前位置:首頁(yè)>新聞資訊>新聞動(dòng)態(tài)濟(jì)南活動(dòng)板房安裝順序及方法

濟(jì)南活動(dòng)板房安裝順序及方法

來(lái)源:http://m.nbcmds.com 日期:2020-08-05 發(fā)布人:
濟(jì)南活動(dòng)板房與建樓房差不多,將四周及隔墻基礎(chǔ)找平,盡量用鋼筋混凝土,比較結(jié)實(shí);然后立柱子,用橫向梁將骨架連起來(lái),上隔板、外墻板與門(mén)窗框;跟著鋪地板,再向上安上一層,然后上屋架和屋面板;然后安裝門(mén)窗等,拉豎向支撐。還有就是衛(wèi)生潔具啊、小五金之類(lèi)的。
Jinan mobile board house is similar to a building. The surrounding and partition wall foundation should be leveled, and reinforced concrete should be used as much as possible to make it more solid; then, columns should be erected, and the framework should be connected with transverse beams, and the partition board, outer wall panel and door and window frames should be installed; then, the floor should be paved, and then the roof truss and roof panel should be installed; then, doors and windows should be installed and vertical support should be pulled. There are sanitary ware, hardware and so on.
其實(shí)這種就是輕鋼結(jié)構(gòu),與重鋼結(jié)構(gòu)廠房很類(lèi)似。濟(jì)南活動(dòng)板房隱蔽工程是指在施工過(guò)程中,完成上一道工序后,將被下一道工序所掩蓋,全部完工后無(wú)法進(jìn)行檢查的部位,做居室裝修,“隱蔽工程”是關(guān)鍵,如果“隱蔽工程”沒(méi)有做好,表面裝飾得再漂亮,也是徒勞。
In fact, this is the light steel structure, which is very similar to the heavy steel structure workshop. The concealed project of Jinan mobile plank house refers to the parts that will be covered by the next process after the completion of the previous process, and can not be inspected after the completion of all the parts. The "hidden project" is the key. If the "hidden project" is not done well, the surface decoration will be more beautiful, which is also futile.
“隱蔽工程”可分為水安裝、電安裝及防潮、防水等項(xiàng)目。其中的每一個(gè)項(xiàng)目都不容忽視,如果哪一個(gè)環(huán)節(jié)出了問(wèn)題,都可能帶來(lái)嚴(yán)重的經(jīng)濟(jì)損失,甚對(duì)人身帶來(lái)傷害。防水工程的施工工藝和材料識(shí)別,避免不必要的經(jīng)濟(jì)損失和傷害。
"Concealed works" can be divided into water installation, electrical installation and moisture-proof, waterproof and other projects. Every project can not be ignored. If any link goes wrong, it may bring serious economic losses, even harm to personal safety. Waterproof engineering construction technology and material identification, to avoid unnecessary economic loss and injury.
一:按照活動(dòng)板房基礎(chǔ)施工圖,把建設(shè)基礎(chǔ),晾曬少3天,之后開(kāi)始才可以建設(shè)板房墻體。緊靠平面圖中雙線的內(nèi)邊鋪設(shè)地梁,用爆炸螺栓連接,在地梁的各個(gè)連接角及個(gè)中樹(shù)立柱子,注意:板房山墻兩邊樹(shù)立雙斜口柱。
1: According to the construction drawing of the movable plank house foundation, the construction foundation should be dried for at least 3 days, and then the board house wall can be constructed. Lay the ground beam close to the inner edge of the double line in the plan, connect it with explosive bolts, and set up columns in each connection angle and one of the ground beams. Note: double inclined column shall be set up on both sides of gable wall of slab house.
二:根據(jù)施工圖的各個(gè)視圖在地上拼裝好墻體,在底端用5.2的鉚釘鉚接上鋁材地扣槽,記住按施工圖的位置截出門(mén)窗的位置,并且鉚接上鋁材框,注意:板與板之間先不鉚接,只是先平鋪組裝,以定好門(mén)窗位置及鉚好門(mén)窗鋁材框。
2: According to each view of the construction drawing, the wall is assembled on the ground, and the aluminum floor buckle groove is riveted with 5.2 rivets at the bottom. Remember to cut out the position of the door and window according to the position of the construction drawing, and rivet the aluminum frame. Note: there is no riveting between the plate and the plate, but first lay and assemble, so as to fix the position of the door and window and rivet the aluminum frame of the door and window.
三:根據(jù)濟(jì)南活動(dòng)板房設(shè)計(jì)平面圖,把已經(jīng)拼裝過(guò)的各個(gè)位置的板一張一張的逐一立起來(lái),板與板之間用鉚釘鉚接,外轉(zhuǎn)角用圓弧鋁鉚接,內(nèi)轉(zhuǎn)角用角鋁鉚接。
3: According to the design plan of Jinan mobile house, the boards at each position that have been assembled are erected one by one. Rivets are used to rivet between plates, arc aluminum rivets are used for outer corners, and angular aluminum rivets are used for inner corners.
四:按照活動(dòng)板房施工圖中的大波瓦分布圖逐一往如上圖完成的實(shí)體上蓋上大波瓦,用75的自攻釘鏈接。
4: According to the distribution diagram of large wave tiles in the construction drawing of movable board house, cover the completed entity as shown in the above figure one by one, and use 75 self tapping screws to link.
五:在活動(dòng)板房屋脊上鉚接上屋脊瓦,山墻接上山墻收口,前后檐接上水槽,均用鉚釘鉚接。(平頂型的沒(méi)有屋脊和屋脊瓦。)然后在板房的屋頂?shù)拿織l縫隙上和每個(gè)鉚釘上打上玻璃膠,外墻縫隙及窗四周都打上玻璃膠。
5: The roof ridge tile is riveted on the roof ridge of the movable board house, the gable is connected with the gable closure, and the front and rear eaves are connected with the flume. (the flat top type has no ridge and roof tiles. )Then, glass glue is applied to every gap and rivet on the roof of the board house, and glass glue is applied to the cracks of the outer wall and around the windows.
以上就是今天為大家分析的關(guān)于濟(jì)南活動(dòng)板房安裝順序及方法的全部?jī)?nèi)容,希望對(duì)大家能有所幫助,如果想要了解更多內(nèi)容可以電話聯(lián)系我們或者在我們的網(wǎng)站進(jìn)行留言,我們的工作人員會(huì)及時(shí)與大家取得聯(lián)系。
The above is the analysis of today's Jinan mobile plank house installation sequence and method of the whole content, I hope to help you, if you want to know more, you can contact us by phone or leave a message on our website, our staff will contact you in time.

聯(lián)系電話:18765446878

咨詢(xún)熱線:18765446878(微信同號(hào))

地址:禹城市十里望鎮(zhèn)山東國(guó)際商貿(mào)港往南660米

備案號(hào):魯ICP備2023024436號(hào) 魯公網(wǎng)安備37010202001695號(hào) 網(wǎng)站地圖|XML|TXT

微信二維碼

微信二維碼